{"id":186,"date":"2025-12-15T07:09:31","date_gmt":"2025-12-15T07:09:31","guid":{"rendered":"https:\/\/constrobook.com\/blog\/?p=186"},"modified":"2026-04-02T00:16:48","modified_gmt":"2026-04-02T00:16:48","slug":"top-10-luxury-townships-in-india-a-builders-engineers-and-contractors-view","status":"publish","type":"post","link":"https:\/\/constrobook.com\/blog\/top-10-luxury-townships-in-india-a-builders-engineers-and-contractors-view\/","title":{"rendered":"Top 10 Luxury Townships in India \u2014 a builder\u2019s, Engineer&#8217;s and contractor\u2019s view"},"content":{"rendered":"\n<p><br><br>An original, construction-focused blog by Constrobook<br><br><br><strong>The ten well known townships covered<\/strong>.<br><br>1. Lodha The Park \u2014 Worli \/ Lower Parel, Mumbai. <br><br><br>2. DLF The Camellias \u2014 Golf Course Road, Gurugram. <br><br><br>3. Lodha Altamount \u2014 Altamount Road (Tardeo), Mumbai. <br><br><br>4. Prestige \/ Whitefield flagship township (Prestige city \/ Whitefield launches) \u2014 Bangalore (Whitefield). <br><br><br>5. Brigade Gateway (integrated precinct) \u2014 Bangalore. <br><br><br>6. Mahindra World City (Integrated Township) \u2014 Chennai (Maraimalai Nagar \/ GST Road). <br><br><br>7. Hiranandani Gardens \/ Estate (Powai \/ Thane) \u2014 Mumbai metro region. <br><br><br>8. Godrej Green Vistas (Mahalunge \/ Pune) and Godrej township offerings \u2014 Pune cluster. <br><br><br>9. Oberoi Garden City \u2014 Goregaon East \/ Mumbai (integrated ~80 acre precinct). <br><br><br>10. Aerotropolis (GMADA \/ Mohali \u2014 large upcoming township) \u2014 massive public-sector led township (news\/clearance). <br><br><br><strong>How I\u2019m treating the numbers (method &amp; transparency)<\/strong><br><br>Project facts (acreage, number of towers\/units, launch status, price band) come from developer pages, RERA listings and reputable portals \u2014 cited inline.<br><br>Construction metrics (approximate built-up area, saleable area, material tonnages, labour needs, jobs created, and expected short-to-mid term uplift) are estimates derived with conservative, industry thumb-rules used by contractors and quantity surveyors:<br><br>Steel: 3.0\u20134.5 kg per sq.ft. (typical for reinforced-concrete residential towers \u2014 use a project-specific value inside the text). <br><br>Cement: ~0.4\u20130.5 cement bags per sq.ft. (thumb-rule). <br><br>Bricks: ~500\u2013550 bricks \/ 100 sq.ft. built-up (another common thumb-rule). <br><br>Labour productivity &amp; labour rates for rough estimation: labour inputs from Indian construction productivity guides; labour cost bands used only to estimate worker-counts and man-days. <br><br><br><br><strong>1) Lodha \u2014 Lodha The Park (Worli \/ Lower Parel, Mumbai)<\/strong><br><br>Snapshot (published): Spread ~14\u201318 acres, multiple super-tall towers (tall towers up to ~76\u201379 floors in some listings), ~2,600 units in the complex (developer pages and property portals). Ultra-luxury finishes; premium flat sizes and private-park amenity model. <br><br>Construction \/ technical summary (contractor viewpoint):<br><br>Estimated land area: 14\u201318 acres (published). <br><br>Published towers \/ units: ~14 towers, 2,600 units (various sources list similar counts). <br><br>Estimated built-up area (practical estimate): for a high-rise luxury township with tall towers and large podiums we typically see built-up (super built) area \u2248 2.5\u20133.5\u00d7 the net land area in sqft depending on FAR and parking podiums.<br><br>If we take 15 acres \u2248 653,400 sq.ft. (1 acre = 43,560 sq.ft.). Using multiplier 3.0 \u2192 approx built-up \u2248 1.96 million sq.ft. (1.9\u20132.3 million sqft range).<br><br><br>Saleable area: for premium projects saleable (super built) is ~85\u201390% of built-up (common when podiums, O&amp;M areas and commercial pieces included). \u2192 ~1.7\u20131.9 million sq.ft. (projected).<br><br>Technical specs &amp; finishes: premium RCC core + composite high-rise structure; double glazed fa\u00e7ade on premium towers; multiple swimming pools, clubhouses, 7-acre private park (developer lines). Mechanical systems: central HVAC for some podium amenities, in-tower lifts with destination control, 24\/7 power back-up for essential services, treated sewage plants and rainwater harvesting (standard on large MMR projects). <br><br><br>Amenities: large private park, clubhouses, multiple pools, landscape promenades, concierge &amp; hotel-style services (developer brochure). <br><br>Price band (published): premium \/ ultra-luxury \u2014 Mumbai-scale pricing (crore-level per unit; portal figures for resales show high-end pricing). <br><br>Construction inputs \u2014 ballpark estimates (method &amp; numbers):<br>(Assumptions shown; you can alter yield factors)<br><br>Built-up area assumed: 2,000,000 sq.ft. (round number within estimate range).<br><br>Steel: assume 3.5 kg\/sq.ft (mid for high-rise RCC residential). \u2192 Steel \u2248 7,000,000 kg \u2248 7,000 tonnes. <br><br>Cement: assume 0.45 bags\/sq.ft \u2192 900,000 bags (1 bag \u2248 50 kg) \u2192 45,000 tonnes cement. <br><br>Bricks: thumb rule 500 bricks \/100 sq.ft \u2192 10 \u00d7 built-up sqft \/100 = 10 \u00d7 20,000 = 2,000,000 bricks (rounded). <br><br>Estimated direct construction workforce (peak on site): large high-rise jobs of this size typically peak at several thousand field workers (mason, steel fixers, carpenters, concreters, plumbers, electricians and helpers). Using productivity thumb rules you can approximate peak on-site labour ~1,200\u20132,000 workers during peak concrete\/shuttering phases (depends on schedule compression). <br><br>Jobs created (direct + indirect): direct construction jobs over the life of the project (3\u20137 years) could be ~8,000\u201315,000 man-years (sum of all direct worker man-years) including allied services and lasting O&amp;M jobs post completion. This is a high-level estimate; actual depends on construction schedule and contractor resourcing.<br><br><br>Why this matters for contractors: high steel tonnages, tight logistics in South Mumbai (inventory &amp; temporary stacking constraints), high formwork &amp; cranage needs (tower cranes, jump-form systems where used), deep foundation \/ Pile work cost &amp; schedule are major drivers. Material procurement needs aggressive prefabrication and JIT deliveries to keep site footprint clear.<br><br>Value appreciation (local market view): projects in Worli\/Lower Parel historically show strong long-term appreciation given scarcity of land and premium location. (Mumbai top-end prices are among the highest in India). <br><br><br><strong>2) DLF \u2014 The Camellias (Golf Course Road, Gurugram)<\/strong><br><br>Snapshot (published): Spread ~16\u201317.5 acres, 16 towers, 429 ultra-luxury residences (4\u20137 BHK \/ penthouses); extremely large unit sizes (7,000\u201311,000 sqft for luxury villas\/penthouses), very low density (only ~25% area built, 75% open). Price band: several tens of crores for premium pieces. <br><br>Construction \/ tech summary:<br><br>Land &amp; units: ~17.5 acres, 429 super-luxury residences in 16 towers; built form is low-rise podiums plus very large units per tower. <br><br>Built-up estimate: because the units themselves are extraordinarily large (7\u201311k sqft per unit for some) and development keeps large open spaces, total built-up is modest compared with land \u2014 estimated ~1.2\u20131.6 million sqft across the complex (developer data on units and sizes supports this order). <br><br>Material &amp; labour estimate (approx): lower total built-up but heavier per-unit finishes and MEP intensity. If we assume 1.4 million sqft built-up:<br><br>Steel @ 3.5 kg\/sq.ft \u2192 ~4,900 tonnes. <br><br>Cement @ 0.45 bag\/sq.ft \u2192 ~630,000 bags \u2248 31,500 tonnes. <br><br>Bricks proportionally lower due to more RCC and blockwork finish \u2192 ~1\u20131.2 million bricks. <br><br><br>Labour: peak workforce smaller than a high-density township (peak ~700\u20131,200 workers), but a higher proportion of skilled labour (marble fitters, bespoke carpenters, MEP technicians).<br><br>Project complexities: bespoke finishes demand long lead items (stone cladding, imported fittings), higher MEP complexity (smart home, large lifts, private pools), and specialist subcontractors (home automation, private spa fittings). Logistics on Golf Course Road support heavy equipment but on-site staging for ultra-luxury finishes is intensive.<br><br><br>Market &amp; appreciation note: this is trophy real estate for HNI buyers \u2014 typically low volume but high absolute value; value appreciation depends on national luxury housing trends and Gurgaon\u2019s office\/residential demand. <br><br><br><br><strong>3) Lodha \u2014 Altamount (Altamount Road \u2014 Tardeo \/ \u201cBillionaire\u2019s Row\u201d)<\/strong><br><br>Snapshot (published): single-tower, boutique super-luxury: small plot (~0.5\u20131 acre), only ~50\u201360 units, single-residence-per-floor concept (units several thousand sqft), high-end finishes and concierge services. <br><br>Construction summary &amp; estimate:<br><br>Built-up: small footprint; published project size ~50\u201360 units and about 43 floors \u2014 gross built-up around ~200\u2013300k sqft (developer portals show project size ~1 acre and ~52 units). <br><br>Material estimates (approx): using 250,000 sqft built-up: steel ~875 tonnes; cement bags ~112,500 bags (~5,625 tonnes). <br><br>Labour: a boutique tower still requires specialized masonry &amp; finishing crews but overall peak on-site workforce smaller (~250\u2013500 workers).<br><br>Construction features: deep basement(s), sophisticated fa\u00e7ade, bespoke lobbies and art installations \u2014 these increase non-structural cost and schedule.<br><br><br><br><br><strong>4) Prestige \/ Whitefield (Bengaluru \u2014 Prestige City \/ Whitefield townships and new launches)<\/strong><br><br>Snapshot (published): Prestige has multiple large mixed-use \/ township launches in Whitefield and nearby nodes \u2014 recent launches describe 20\u201335+ acres and masters with 14 towers &amp; 2,000+ residences in some phases. (Developer project listings and prelaunch materials). <br><br>Construction \/ contractor view:<br><br>Typical masterplan: 20\u201335 acre phases, towers 14\u201340 floors depending on phase, saleable units 1,500\u20132,200 per larger phase. <br><br>Built-up estimate (example 24 acres \/ 14 towers \/ 2,100 units): 24 acres = 1,045,440 sqft; with a built-up multiplier 2.5\u20133.0 \u2192 ~2.6\u20133.1 million sqft. Use 3.0\u00d7 \u2192 3.14 million sqft for calculations.<br><br>Material estimates (approx): using 3,000,000 sqft: steel \u2248 10,500 tonnes; cement \u2248 1.35 million bags (\u224867,500 tonnes). <br><br>Labour: peak workforce for a big Whitefield phase can be 2,000\u20133,500 workers on site depending on phasing; duration typically 4\u20136 years for multi-tower phasing.<br><br>Construction issues: Bengaluru sites need detailed water management, stormwater planning, and traffic management plans; MEP coordination critical for clubhouse &amp; retail pods.<br><br><br><br><strong>5) Brigade Gateway (Rajajinagar \/ Malleshwaram precinct, Bangalore) \u2014 an integrated precinct<\/strong><br><br>Snapshot (published): Brigade Gateway is an integrated project with residential towers (~13 towers), retail mall, office block and hospital &amp; school \u2014 published built-up split shows residential \u22482.2 million sqft, retail \u22481 million sqft and office \u22481.6 million sqft (developer \/ consultant summaries). Total built-up across uses is multi-million sqft. <br><br>Construction notes:<br><br>Built-up (published): residential ~2.2 million sqft (published), office &amp; retail add another ~2.6 million sqft \u2014 total built area ~4.8\u20135 million sqft. <br><br>Material &amp; labour: large mixed-use schemes are steel-intensive in podiums &amp; commercial blocks; rough estimate for total complex (5 million sqft): steel ~17,500 tonnes; cement bags ~2.25 million (\u2248112,500 tonnes). <br><br>Labour &amp; specialised trades: retail &amp; mall fit-outs require separate schedules\u2014peak labour easily 3,500\u20136,000 workers when combined (civil + fitout phases). The major contractor spends heavily on hoists, tower cranes, formwork, and large concrete pours for podiums. <br><br><br><br><strong>6) Mahindra World City (Chennai \u2014 Maraimalai Nagar \/ GST Road<\/strong>)<br><br>Snapshot (published): Mahindra World City (MWC) Chennai is one of India\u2019s earliest and largest integrated business cities \/ townships \u2014 developer and government partnership \u2014 spread widely (published figures show 1,500+ acres for the first phase; some sources reference 1,550 acres) and designed as a combined SEZ + residential + industrial ecosystem. It has produced tens of thousands of direct jobs historically and hosts large industrial employers. <br><br>Construction \/ strategic view:<br><br>Scale: because this is a mega-township with industrial parks, commercial campuses, plotted sectors and residential enclaves \u2014 the built-up across phases is in tens of million sqft (aggregated). Many different builders and plot owners build within MWC. <br><br>Developer facts: Mahindra reports direct employment figures and export contributions; Mahindra\u2019s residential brands (Aqualily, Lakewoods, Happinest) have launched product ranges inside the township. <br><br>Construction\/materials: for the residential neighbourhoods alone, tens of thousands of tonnes of steel and hundreds of thousands of tonnes of cement are typical across the multi-year build out. (Because this is an ongoing urban development the materials and jobs run into multi-year, multi-contractor aggregates.) <br><br>Job creation: Mahindra World City has historically created tens of thousands of direct jobs in manufacturing &amp; services for the SEZ\/commercial side (developer numbers cite ~40,000 direct jobs over time). This is a hybrid development: residential construction jobs are one component; industrial\/commercial job creation is the larger long-term employment story. <br><br><br><br><strong>7) Hiranandani Estate \/ Hiranandani Gardens (Powai \/ Thane)<\/strong><br><br>Snapshot (published): Hiranandani\u2019s Powai \/ Thane townships are classic integrated precincts (parks, schools, hospitals, mixed residential towers and bungalows) built over large footprints (100s of acres across their clusters); Hiranandani Estate in Thane alone represents a multi-phase 200\u2013250+ acre cluster. <br><br>Construction view:<br><br>Multi-phase nature: Hiranandani projects are built over decades, so material and labour demands are steady long-term rather than a single spike. A single large phase (e.g., new township sector) could be several million sqft built-up and involve thousands of tonnes of steel and tens of thousands of cement bags. <br><br>City connectivity &amp; value: connectivity to Mumbai, schools &amp; hospitals has historically supported steady price growth and rental demand. Hiranandani projects emphasize landscaping and community facilities, driving higher landscape\/finishing costs than simple high-rise volumes.<br><br><br><br><strong>8) Godrej \u2014 Godrej Green Vistas \/ Godrej townships (Pune \u2014 Mahalunge &amp; other clusters<\/strong>)<br><br>Snapshot (published): Godrej Properties runs masterplanned neighbourhoods (Green Vistas, Green Cove etc). Example: Godrej Green Vistas (Mahalunge) ~4.7 acres for that phase; Godrej masterplans in Pune &amp; Bengaluru are larger when aggregated. <br><br>Construction view:<br><br>Typical phase scale: 4\u201330 acres per phase, with 3\u20134 towers often; built-up for a 4.7 acre phase might be 300\u2013400k sqft; for a large masterplan phase (20\u201340 acres) built-up can be 2\u20133 million sqft. <br><br>Technical note: Godrej emphasises green spaces, high open area %, and IGBC\/green footprints \u2014 these add early civil works (stormwater, landscaping, bio-retention), and often minor increases in initial civil cost but better long-term running costs.<br><br><br><br>9) Oberoi Garden City (Goregaon East \/ Mumbai)<br><br>Snapshot (published): Oberoi Garden City is an ~80 acre integrated precinct with residences, Oberoi Mall, school, offices \u2014 developer pages cite ~80 acres and integrated masterplan features. <br><br>Construction perspective:<br><br>Mixed-use geometry: similar to Brigade Gateway but on a smaller scale \u2014 residential clusters + mall + school + offices and landscaped corridors. Multi-million sqft built-up across the precinct is typical (developer\/consultant pages put surface areas in multiple lakh sqft ranges). <br><br>Construction inputs: podium pours, large basements for malls (mass excavation, dewatering), and complexity of staging retail vs residential fit-outs lead to high MEP coordination needs.<br><br><br><br><strong>10) Aerotropolis Mohali (GMADA \/ Mohali \u2014 upcoming mega-township)<\/strong><br><br>Snapshot (news &amp; public-sector): GMADA\u2019s Aerotropolis project received SEIAA environmental approval and is a planned ~5,500 acre integrated township adjacent to Aerocity \/ airport (public news item). This is a massive, government-led masterplan with phased infrastructure works awarded to consortia. <br><br>Construction &amp; long-term perspective:<br><br>Scale &amp; phasing: this is a multi-decade build; Phase 1\/early sectors focus on grid roads, drainage and trunk infrastructure. Internal roads, utilities and later plot development and developer-led construction will create waves of jobs &amp; material demand across several years. <br><br>Job &amp; material impact (macro): for a 5,500-acre township the eventual built-up could run into tens of millions of sqft; material tonnages and labour demand aggregated across all phases will be in the millions of tonnes of cement and 100k+ tonnes of steel over a decade. The public-sector phase creates large direct civil works contracts early (roads, major utilities), then developer construction spikes later.<br><br><br><br>Estimated material consumption and labour \u2014 worked example (applies to every township above)<br><br>Thumb-rules I used (industry common rules):<br><br>Steel: 3.0\u20134.5 kg \/ sq.ft. (use 3.5 kg\/sq.ft for conservative high-rise estimates). <br><br>Cement: 0.4\u20130.5 bags \/ sq.ft. (use 0.45 bag\/sq.ft for mid estimate). <br><br>Bricks: ~500 bricks \/ 100 sq.ft. (i.e., 5 bricks \/ sq.ft). <br><br>Peak labour: approximated from productivity thumb rules \u2014 productivity tables show man-day outputs (shuttering, bar-bending, plastering etc.). For an approximate headcount during peak heavy works I used peak labour \u2248 built-up sqft \/ 1,000 \u00d7 1.0\u20132.0 (a rule-of-thumb expressing how many tradesmen simultaneously work per 1,000 sqft during intense concrete\/structural phases). This yields conservative headcount ranges matching contractor experience. <br><br><br>Worked example (compact): for 1,000,000 sq.ft. built-up:<br><br>Steel \u2248 1,000,000 \u00d7 3.5 kg = 3,500,000 kg = 3,500 tonnes.<br><br>Cement \u2248 1,000,000 \u00d7 0.45 bags = 450,000 bags = 22,500 tonnes (50 kg bag).<br><br>Bricks \u2248 1,000,000 \u00d7 5 = 5,000,000 bricks.<br><br>Peak labour (rule-of-thumb) \u2248 (1,000,000 \/ 1,000) \u00d7 1\u20132 = 1,000\u20132,000 workers at peak, across all trades. <br><br><br>Use the above multipliers to scale for each township\u2019s built-up estimate.<br><br><br><strong>Value appreciation &amp; investment notes (township scale)<\/strong><br><br>Location &amp; infrastructure are the drivers. Townships on strong transport corridors (Worli, Golf Course Road, Whitefield, GST Road, and airport corridors) have historically posted stronger appreciation. This is supported by luxury housing market analytics showing Mumbai, Bengaluru and NCR as top performers in luxury segment sales and price resilience. <br><br>Integrated amenities, schools and quality of operations differentiate which townships hold price better. Townships with integrated employment centres (like Mahindra World City) produce endogenous demand (people work where they live) and therefore steadier rental yields and mid-term appreciation. <br><br><br><br><strong>How many jobs will a typical luxury township produce? (summary estimate)<\/strong><br><br>Direct construction jobs (multi-year): for a 1\u20133 million sqft phase expect several thousand direct workers cumulatively during construction. Over a 3\u20136 year build the sum total can be 5,000\u201325,000 man-years depending on phasing intensity. (Large integrated projects spread over multiple phases aggregate to tens of thousands of man-years). <br><br>Indirect &amp; long-term jobs: retail, F&amp;B, security, facility management, education &amp; healthcare create permanent jobs once the township is operational \u2014 a big mall or SEZ within the township can add thousands of long-term jobs (Mahindra World City example: developer-reported 40k direct jobs over time). <br><br><br><br><strong>Construction-management takeaways for contractors \/ project managers<\/strong><br><br>1. Procurement &amp; staging: high-value townships in dense metros require JIT (just-in-time) deliveries and prefabrication (precast, pre-assembled MEP trunks) to minimise site stacking.<br><br>2. Specialist trades: luxury finishes require coordinators for stone, joinery, home-automation and MEP commissioning \u2014 these trades often become the critical path.<br><br>3. Sustainability &amp; compliance: modern townships emphasise IGBC\/LEED features, STP, and water reuse \u2014 early planning saves rework.<br><br>4. Labour management: large sites need structured labour welfare, site transport &amp; on-site feed to reduce absenteeism; skilled labour pools (bar-benders, formwork supervisors) are the bottleneck.<br><br>5. Value engineering: at ultra-luxury scale, 2\u20135% savings in fa\u00e7ade\/finishes or mechanical systems can free significant capital for amenity upgrades.<br><br>Team<\/p>\n\n\n\n<p>Constrobook<\/p>\n\n\n\n<p>www.constrobook.com<\/p>\n<div class=\"pld-like-dislike-wrap pld-template-1\">\r\n    <div class=\"pld-like-wrap  pld-common-wrap\">\r\n    <a href=\"javascript:void(0)\" class=\"pld-like-trigger pld-like-dislike-trigger  \" title=\"\" data-post-id=\"186\" data-trigger-type=\"like\" data-restriction=\"cookie\" data-already-liked=\"0\">\r\n                        <i class=\"fas fa-thumbs-up\"><\/i>\r\n                <\/a>\r\n    <span class=\"pld-like-count-wrap pld-count-wrap\">0    <\/span>\r\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>An original, construction-focused blog by Constrobook The ten well known townships covered. 1. Lodha The Park \u2014 Worli \/ Lower Parel, Mumbai. 2. DLF The Camellias \u2014 Golf Course Road, Gurugram. 3. Lodha Altamount \u2014 Altamount Road (Tardeo), Mumbai. 4. Prestige \/ Whitefield flagship township (Prestige city \/ Whitefield launches) \u2014 Bangalore (Whitefield). 5. Brigade [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[6,4,5,11,10,9,7],"class_list":["post-186","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs","tag-civil-engineer","tag-construction","tag-construction-jobs","tag-delhi-real-estate","tag-mumbai-real-estate-market","tag-real-estate","tag-www-constrobook-com","entry","has-media"],"_links":{"self":[{"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/posts\/186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/comments?post=186"}],"version-history":[{"count":4,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/posts\/186\/revisions"}],"predecessor-version":[{"id":192,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/posts\/186\/revisions\/192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/media\/44"}],"wp:attachment":[{"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/media?parent=186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/categories?post=186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/constrobook.com\/blog\/wp-json\/wp\/v2\/tags?post=186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}